Thursday, January 31, 2008

Tile Installation Day!


The moment of truth!



And the moment of satisfaction for everyone to finally see these tiles on the wall...even though the kitchen itself is not completed. I will try to get back to this post later, and add pictures from a later date showing the finished kitchen.


I am always very appreciative of the care and intuition that a good tile installer brings to the installation of these custom tile jobs. The tiles in a mural, particularly, are irreplaceable, and each tile has to be handled with utmost care. These guys did a great job.








Click on the images to see them bigger!
To see more of these tiles before installation, and even before firing (interesting) scroll down this blog page to December 23 2007, and January 23,2008.

1 comment:

  1. I think you're amazing. Your blog leaves me stunned. I'm a huge fan, and also in awe of how much you accomplish. Wow, you're spectacular!

    ReplyDelete